Minimum orders and lead times: planning amenity supply
Two numbers shape your amenity supply more than price: the minimum order and the time it takes to arrive. Plan around both and you avoid emergencies.
Why minimums exist
Minimum order quantities come from production reality: a filling line has to be set up, a label printed, a fragrance blended. Custom items usually have higher minimums than standard ones. Knowing the reason helps you negotiate. You can often lower a minimum by accepting a standard component, such as a stock bottle with a custom label.
Ask the supplier to state minimums per item, per fragrance and per colour, since these can differ. A custom label may need one quantity, while a custom fragrance may need another. Knowing which element drives the minimum helps you choose where to customise and where to stay with standard.
Ask one more question: what is the earliest you could receive a small emergency top-up if a delivery is late? Even a partial answer helps you plan, and a supplier who has thought about it is easier to rely on. Record the answer in your supplier file.
Lead time has several parts
Break the quoted time into stages so you can see where it might stretch.
- Order confirmation and artwork approval.
- Component procurement, such as bottles, pumps and cartons.
- Production and filling.
- Quality checks and packing.
- Freight, customs where relevant, and delivery to your store.
Ask which stage varies most. For imported goods it is usually freight; for custom packaging it is often the components.
Ask for the lead time in working days or weeks from artwork approval, not from order, and ask whether it includes freight. Two quotes may use different starting points and look different when they are in fact the same. Compare them on a shared basis.
A worked example (illustrative)
For example, suppose a supplier quotes eight weeks from approval to delivery, and you use about 1,500 units a month. Add a two-week safety margin for delays and one week for your internal receiving. Your reorder point must cover ten to eleven weeks of use, around 3,700 units, so you must place the next order when stock hits that level. If the minimum order is 5,000 units, that is about three and a half months of stock and needs shelf space. These numbers are only an illustration; use your own.
Think also about shelf space. A 5,000-unit order of small bottles may fit on two pallets; large refill containers may need more room per litre but fewer cartons per month. Measure your store before you commit.
Ways to reduce risk
- Order one standard line first while custom items are in production.
- Split a large minimum into scheduled call-offs if the supplier allows.
- Agree a fixed delivery window and a notification if it slips.
- Hold a small buffer of the most critical item, usually hand soap and shampoo.
Keep a log of each supplier's actual delivery time against the quoted time. After four or five orders you will have a realistic figure and can set your safety margin on evidence rather than hope.
Planning for openings and peaks
A new hotel needs stock before the first guest, not at it. Work backwards from the opening date, adding the time for samples, approvals and the sample-to-bulk step. For festivals and peak months, order earlier; many suppliers are busiest at the same time. The pre-opening process also benefits from a consistent amenity kit approach so there are fewer separate line items to chase.
If you run more than one property, consolidating orders across them can help reach a minimum while keeping stock levels sensible at each site. Agree in advance how stock is split and who holds the central account.
Ask early, plan once
Put minimums and lead times in your specification file and update them when quotes change. Ask us for current figures on any product through samples or a quote, and note that exact times depend on the product and order.
What to put in your calendar
Mark three dates for each product: the reorder date, the latest date to confirm artwork and the expected delivery date. Share the calendar with purchasing and housekeeping. When a date slips, everyone sees it early and can adjust par levels or hold back a promotion that depends on stock.
Questions on this topic
Can minimum order quantities be negotiated?
Often, especially with standard components or a multi-product order. Ask what drives the number.
How much safety stock should I hold?
Many hotels hold two to three weeks of use on key items. Adjust for the reliability of deliveries.
Do refills change the picture?
They can. Refills are bulkier but need fewer unit packs, so storage and ordering patterns differ.
Keep reading
- What amenities does a 3-star hotel actually need?
- What guests expect from a 5-star bathroom amenity set
- How to calculate amenity cost per occupied room
- How to write an amenity specification for your hotel
- How to stock an Airbnb bathroom
- Hospital and clinic bathroom amenities: what to consider
- Gym locker room amenities: a practical checklist
Looking for supply? See Hotels & resorts, browse the product range or request samples.