How to budget amenities for a new hotel opening

A pre-opening amenity budget covers three things: the one-off costs of setting up the range, the opening stock needed to fill rooms and stores, and the running cost of the first months of trading. Separating these makes the opening figure easier to defend and stops one-off costs from distorting the operating budget.

By Hemang Jain, Founder, Anadoris

Why pre-opening is different from running costs

A hotel in operation buys amenities to replace what guests use. A hotel before opening must buy everything at once: the full room standard for every room, stock for stores and trolleys, equipment such as dispensers, and the design and approval work for any branded range. Many of these costs happen once. If they are mixed into the first year's operating budget, cost per occupied room looks inflated and the owner draws the wrong conclusion.

For the operational checklist of what to buy, see the pre-opening amenity checklist. This guide covers the money.

The three parts of the budget

PartWhat it includesBudget heading
One-off set-upArtwork and design, plates, moulds, custom fragrance development, samples and approval roundsPre-opening expense or capital, per your accounting policy
EquipmentDispensers, brackets, trays, holders, installationUsually capital or furniture, fixtures and equipment
Opening stockRoom fill for every room, stores stock, trolley stock, safety stockPre-opening inventory
First months of tradingReplacement stock as occupancy ramps upOperating budget

Agree with the owner's finance team which heading each line belongs under before the budget is approved. Accounting treatment varies, and getting it settled early avoids reworking the numbers later.

STAY by Anadoris hospitality concept: indian heritage courtyard
Indian heritage courtyard

How to size opening stock

Opening stock is not just one set per room. It usually includes:

  1. Room fill: number of rooms × items per room, by room type.
  2. Trolley stock: number of trolleys × par level per trolley.
  3. Floor or pantry stock: par level per floor store.
  4. Main store stock: forecast consumption for the period until the first replenishment arrives.
  5. Safety stock: cover for forecast error and delivery delay.

New hotels often have uncertain occupancy in the opening months, so size main store stock from a cautious forecast and plan a quick first reorder, rather than buying for a full year up front.

One-off costs to anticipate

  • Design and artwork for the range, including revisions.
  • Printing plates or screens for each design and colour.
  • Custom moulds if a bespoke bottle is chosen.
  • Fragrance development and evaluation for a signature scent; see our atelier.
  • Physical samples and pre-production approvals.
  • Freight for the first delivery, often larger and sometimes faster than normal.

Ask suppliers to separate these from the unit price in the quotation, so you can budget them under the right heading and see what recurs on future orders.

Timing payments against the opening date

Amenity payments in pre-opening often fall due long before revenue starts. Advances for custom ranges are typically paid at order, with balances before dispatch. Work back from the opening date: final room set-up, before that delivery and receiving, before that production, before that approvals and artwork. Place each payment on that timeline and share it with the owner so cash is available when needed. If the opening date moves, check whether stock will age before use.

STAY by Anadoris concept: blush miniature oval bottles with silver caps in a vanity, tall window and wrought iron balcony
Paris boutique hotel

Mistakes that inflate the opening budget

  1. Buying a full year of stock before occupancy is known.
  2. Choosing several fragrances or sizes across room types, each with its own minimum.
  3. Approving artwork late, forcing expensive faster freight.
  4. Leaving dispensers out of the budget until installation.
  5. Not reserving budget for a second order once real usage is known.

A simple pre-opening budget checklist

  • Room standard written and signed off.
  • Quotations itemised into one-off, equipment and unit costs.
  • Opening stock calculated by location.
  • Payment timeline aligned to the opening date.
  • Accounting heading agreed for each line.
  • Contingency for changes to the opening date.

STAY can prepare an itemised quotation for an opening, separating set-up, equipment and stock; request it through the quote page.

Questions on this topic

Should opening stock cover a full year?

Usually not. Occupancy in the first months is uncertain, so buy for a shorter period and plan an early reorder.

Are dispensers an amenity cost?

They are equipment and are usually budgeted separately from consumables. Confirm the heading with the owner's finance team.

What if the opening date slips?

Check shelf life and storage for stock already delivered, and ask the supplier whether later deliveries can be rescheduled.